• Sign Up
    • Monthly Recurring
  • About
  • Advertise
  • Contact Us
  • Corrections
  • Account
  • Donors
  • Hendersonian people
  • Log In
The Hendersonian
  • Home
  • Local Election ’26
  • News
    • All
    • Agriculture
    • Business
    • Local
    • Police
    • Politics
    • Schools
    • Science
    • Sports
    • State
    • World

    BRIEFS: HCS celebrates veterans; Closures on Ky. 1078; Watson Lane work

    Amendment to curtail governor’s pardon power wins by large margin

    Zach Dembo returns 6th District to Democratic hands after victory over Alvarado

    Zach Dembo returns 6th District to Democratic hands after victory over Alvarado

    Rep. Andy Barr wins race to replace Sen. Mitch McConnell

    Rep. Andy Barr wins race to replace Sen. Mitch McConnell

    Industry pro bullish on bourbon’s prospects here

    Industry pro bullish on bourbon’s prospects here

    Hendersonian’s Tweddell receives chamber’s Catalyst Award

    Hendersonian’s Tweddell receives chamber’s Catalyst Award

    Trending Tags

  • Entertainment
    • All
    • Gaming
    • Movie
    • Music
    • Sports
    Plummer, Smith cap Henderson County cross country season with personal bests at state

    Plummer, Smith cap Henderson County cross country season with personal bests at state

    November’s a mix of sequels, prequels and awards contenders

    November’s a mix of sequels, prequels and awards contenders

    ‘Happy Holly Day’ movie to premiere here Nov. 28

    ‘Happy Holly Day’ movie to premiere here Nov. 28

    Familiar playoff path awaits Henderson County

    Familiar playoff path awaits Henderson County

    Lady Cols win thrilling region championship

    Lady Cols’ season comes to a close in state tournament

    Día de los Muertos festival photo reel

    Día de los Muertos festival photo reel

  • Lifestyle
    • All
    • Fashion
    • Food
    • Health
    • Travel

    Of Public Record from the November print edition

    Local Achievement: La Campirana, co-owned by Henderson resident Abraham Brown, will receive prestigious recognition from the Government of Mexico

    Local Achievement: La Campirana, co-owned by Henderson resident Abraham Brown, will receive prestigious recognition from the Government of Mexico

    Kentucky community colleges working to meet students’ ‘severe’ need for mental health support

    About 80,000 Kentuckians have lost access to food aid under federal rule changes

    Find another perspective of the American Revolution in Vincennes

    Find another perspective of the American Revolution in Vincennes

    Local Achievement

    Local Achievement

    The Flavor of Autumn

    The Flavor of Autumn

    Trending Tags

  • Public Notices
No Result
View All Result
  • Home
  • Local Election ’26
  • News
    • All
    • Agriculture
    • Business
    • Local
    • Police
    • Politics
    • Schools
    • Science
    • Sports
    • State
    • World

    BRIEFS: HCS celebrates veterans; Closures on Ky. 1078; Watson Lane work

    Amendment to curtail governor’s pardon power wins by large margin

    Zach Dembo returns 6th District to Democratic hands after victory over Alvarado

    Zach Dembo returns 6th District to Democratic hands after victory over Alvarado

    Rep. Andy Barr wins race to replace Sen. Mitch McConnell

    Rep. Andy Barr wins race to replace Sen. Mitch McConnell

    Industry pro bullish on bourbon’s prospects here

    Industry pro bullish on bourbon’s prospects here

    Hendersonian’s Tweddell receives chamber’s Catalyst Award

    Hendersonian’s Tweddell receives chamber’s Catalyst Award

    Trending Tags

  • Entertainment
    • All
    • Gaming
    • Movie
    • Music
    • Sports
    Plummer, Smith cap Henderson County cross country season with personal bests at state

    Plummer, Smith cap Henderson County cross country season with personal bests at state

    November’s a mix of sequels, prequels and awards contenders

    November’s a mix of sequels, prequels and awards contenders

    ‘Happy Holly Day’ movie to premiere here Nov. 28

    ‘Happy Holly Day’ movie to premiere here Nov. 28

    Familiar playoff path awaits Henderson County

    Familiar playoff path awaits Henderson County

    Lady Cols win thrilling region championship

    Lady Cols’ season comes to a close in state tournament

    Día de los Muertos festival photo reel

    Día de los Muertos festival photo reel

  • Lifestyle
    • All
    • Fashion
    • Food
    • Health
    • Travel

    Of Public Record from the November print edition

    Local Achievement: La Campirana, co-owned by Henderson resident Abraham Brown, will receive prestigious recognition from the Government of Mexico

    Local Achievement: La Campirana, co-owned by Henderson resident Abraham Brown, will receive prestigious recognition from the Government of Mexico

    Kentucky community colleges working to meet students’ ‘severe’ need for mental health support

    About 80,000 Kentuckians have lost access to food aid under federal rule changes

    Find another perspective of the American Revolution in Vincennes

    Find another perspective of the American Revolution in Vincennes

    Local Achievement

    Local Achievement

    The Flavor of Autumn

    The Flavor of Autumn

    Trending Tags

  • Public Notices
No Result
View All Result
The Hendersonian
No Result
View All Result
Home News Schools

EXPLAINER: The costs of the HVAC project at South Middle School

Vince Tweddell by Vince Tweddell
November 25, 2025
in Schools
0
EXPLAINER: The costs of the HVAC project at South Middle School

Pictured is the South Middle School football field beneath which will hold piping of a geothermal heating and cooling system. (Hendersonian Photo/Vince Tweddell)

0
SHARES
1.7k
VIEWS
Share on FacebookShare on Twitter

Many comments were made online regarding a recent article about the Henderson County School Board’s approval of an $18-plus million bond to help pay for an HVAC project at South Middle School.

The most common comment questioned how an HVAC project could cost so much while others wondered if—or stated that—a new school could be built for that type of money.

We at the Hendersonian thought the questions were legitimate and contacted Henderson County Schools to learn more. We sat down with Superintendent Dr. Bob Lawson and Assistant Superintendent Chad Thompson on Friday.

Many pieces to it

The project is not just an HVAC project, according to Thompson, but in fact several projects rolled into one. No doubt the HVAC piece of the project is the biggest and reason the project is labeled as such. But several other side pieces contribute to the project’s $21.4 million total cost, they say.

Lawson said that when big projects are undertaken, officials look at other connected projects that could be attached to it. That’s because many times some level of deconstruction needs to occur to get into a space to repair something, he said. It makes sense, Lawson said, to inspect other pieces of infrastructure and determine if other repairs need to be made at the same time, instead of coming back a few years later and conducting the same deconstruction for repairs that could have occurred the first time around.

That’s what happened in this project, the administrators said. Last summer, the $213,750 Phase 1 of the project occurred, when Logan & Logan Construction LLC conducted demolition.

Lawson said after the demolition, school officials analyzed what was found and determined other repairs and renovations were needed. The big part of the project, Phase 2, didn’t go out to bid until this fall when officials determined all that the bid would contain.

Aside from the main piece of installing an HVAC system, the bid also included work for new roofing, new window installation, ceiling work, new carpet in the auditorium, painting, a fire suppression system—sprinklers—and all the electrical work. (See list off the winnings bids and explanation at the end of this article.)

Geothermal HVAC

The school system is not replacing the current traditional HVAC system with one that is the same. Instead, it has elected to install a geothermal HVAC system that has a lifespan of 30-50 years, Thompson said.

Thompson said it wouldn’t make sense to replace the current HVAC system with a boiler and water tower HVAC system with a life expectancy of 20 years.

Additionally, he said the geothermal system saves a great deal on energy costs. “It saves a whole lot of energy,” Thompson said.

With a geothermal system, the earth cools or heats treated liquid pumped through pipes deep in the ground, where the earth’s temperature remains relatively constant between 50 and 60 degrees, Thompson said.

The piping will be under the SMS football field. (The field’s turf has already been peeled back in preparation.) To install the piping, workers will drill 112 bores that will reach depths of between 500 and 600 feet, Thompson said.

Liquid will run through 8-inch diameter pipes deep in the earth and when it returns to the school, the liquid is further converted to the proper temperature to either heat or cool the school before being pumped through pipes throughout the building.

Thompson said new pipes will be installed all through the 122,699-square-foot building.

The administrators say it’s more expensive to install this system—the bid came in at $10.79 million—but both said less energy use and longevity will provide greater savings in the long run.

Building costs

Finally, construction costs have inflated so much in the past few years that building anything new the same size as the current SMS building is not a possibility.

“It would take all our money and then what would happen it there was an emergency at another school?” Lawson said.

By selling bonds for $18.69 million, the school system is able to pay for the project, and according to officials with Baird, which is handling the bond sale, HCS has $30 million in bonding capacity remaining.

Thompson added Tarrant Architects, a firm that works with HCS, told him last week that current construction costs for a middle school range from $400 to $500 per square foot.

“And that’s just construction costs,” he said.

That’s up significantly in just the few years since the new Jefferson Elementary School was completed. Thompson said construction costs have more than doubled since then.

The SMS building, at 122,699 square feet, would come with a price tag of $49 million-plus at $400 per square foot, Thompson said. At $500 per square foot, it’s $61 million.

Those costs don’t include fees, inspections, site planning if necessary, architecture work, dirt work and other associated fees, he said.

Thompson said the total cost of a new building with a size similar to SMS would be anywhere from $70 to $90 million.

Below see the different bid packages, winning bidder, cost and work to be done. All information comes from HCS records and Thompson.

Another piece to note is that the associated costs, such as architect/engineer fees, construction contingency, construction manager fee and more, are not included in the information above. Those fees total more than $3 million.

Previous Post

Fiscal court starts process to amend zoning for a path for F&F to build a B&B

Next Post

Harris stars on both sides of the ball to earn Athlete of the Week

Vince Tweddell

Vince Tweddell

Vince Tweddell is the founder, publisher and editor of the Hendersonian.

Next Post
Harris stars on both sides of the ball to earn Athlete of the Week

Harris stars on both sides of the ball to earn Athlete of the Week

  • Sign Up
  • About
  • Advertise
  • Contact Us
  • Corrections
  • Account
  • Donors
  • Hendersonian people
  • Log In

© 2026 The Hendersonian • Henderson, KY 42420

No Result
View All Result
  • Home
  • News
  • Tech
  • Entertainment
  • Lifestyle
  • Public Notices
  • Sign Up
  • About
  • Advertise
  • Contact Us
  • Login

© 2026 The Hendersonian • Henderson, KY 42420